What type of request is classified as Medium Priority?

PRIORITY 2 / MEDIUM: Work orders considered to be important in nature but not urgent or an emergency. These will be completed within 2-5 working days of submission. Priority 2 work orders for the residence halls and kitchen will take precedence over others of the same priority.

  1. Conditions that represent a potential safety or health hazard — danger, damage, or breakage that is not an immediate hazard but could become so with continued use or stress. For example, a loose handrail, loose doorknob, damaged stair tread, or cracked door glass (could move to high, depending on location and risk of danger).
  2. Nuisance conditions that do not require extensive work but which, if not remedied, would reflect poorly on Facilities Operations – for example, paint offensive graffiti, follow-up of one trade’s work by another trade, etc.
  3. Valid, dated requests by customers, which must be completed by a certain date.
  4. Debris or garbage accumulations.
  5. Work that can be worked into existing schedules.
  6. Student Damage Work Orders.