PRIORITY 2 / MEDIUM: Work orders considered to be important in nature but not urgent or an emergency. These will be completed within 2-5 working days of submission. Priority 2 work orders for the residence halls and kitchen will take precedence over others of the same priority.
- Conditions that represent a potential safety or health hazard — danger, damage, or breakage that is not an immediate hazard but could become so with continued use or stress. For example, a loose handrail, loose doorknob, damaged stair tread, or cracked door glass (could move to high, depending on location and risk of danger).
- Nuisance conditions that do not require extensive work but which, if not remedied, would reflect poorly on Facilities Operations – for example, paint offensive graffiti, follow-up of one trade’s work by another trade, etc.
- Valid, dated requests by customers, which must be completed by a certain date.
- Debris or garbage accumulations.
- Work that can be worked into existing schedules.
- Student Damage Work Orders.